The work behind the welcome

Restored with care.
Ready for new memories.

A restoration begun in 2018, giving an extraordinary Bozeman home a future.

The staircase, chandelier, and connecting doorway in December 2018.
The staircase, chandelier, and connecting doorway in December 2018. December 3, 2018 · Owners’ project archive.
The restoration timeline

A project shaped over time.

Restoration of Rouse House began in 2018. The project included a two-year hiatus during COVID before work resumed.

Elsewhere on the estate, Vintage House opened as a rental in June 2020—a separate milestone from the restoration of the historic Rouse House.

The front gable, upper balcony, and porch in August 2018.
The front gable, upper balcony, and porch in August 2018. Owners’ project archive.
Led by Velocity Developments

A shared effort.
A remarkable transformation.

The renovation was led by Velocity Developments, Dan & Jodi’s local Bozeman company, coordinating the design, construction, and specialist teams.

Jodi developed the floor plans and material selections, working with Trevor Pierson at Black Mountain Architecture (BMA) to translate the design into architectural plans.

Built-in shelving, a paneled door, and the connecting rooms before the new interiors.
Built-in shelving, a paneled door, and the connecting rooms before the new interiors. December 3, 2018 · Owners’ project archive.

Dan carried the project through construction and the challenges of adapting an 1881 brick home.

Two brick buildings during restoration with exposed ground between them
During the restoration: the two buildings with work underway in the space between them.

Construction services and consulting from Matt Schuyler at ST Custom Homes, along with Allan Hathaway of A.S. Hathaway Construction, helped accomplish the project. SAV Digital Environments contributed its expertise in integrated technology and modern systems.

Cabinetry was crafted by Trevor Beitman at Futura Cabinetry, with structural and decorative metalwork by Brad Brenteson at Split Mountain Metals.

Brad’s contribution spanned structural supports and decorative details, making him an essential part of the project.

A new chapter, thoughtfully built.

The restoration began in 2018. The work reached far beyond finishes: it included adding a basement beneath the existing Rouse House and addressing the challenges of an aging brick structure.

The owners’ project archive documents the transformation from an overgrown property and connected buildings to the distinct homes and outdoor spaces guests enjoy today. The former connecting annex was removed, allowing Rouse House and Vintage House to stand separately.

The renovation in photographs

What it took
to begin again.

A visual record of the work behind today’s home. The photographs distinguish the earlier condition, demolition and structural work, and later interior construction. These are stages of the project, not the home’s current guest condition. Browse the photographs below and select any image to enlarge it.

Original interiors · Early structural work · Inside the renovation · Awards & press

December 2018 · Inside the house

Before the new interiors.

These early photographs preserve the rooms, staircase, chandelier, and existing finishes at the beginning of the restoration. Some floor coverings had already been removed when these views were taken.

August 2018 · The starting point

The property
as it was.

Twelve photographs from the owners’ archive record the house, porches, driveway, and grounds in August 2018, at the beginning of the project.

01 · Beneath the brick

A home supported.
A new level taking shape.

The project included creating a basement beneath the existing house. These early images show the exposed underside of the structure, excavation, and temporary supports: a perspective that finished photographs rarely reveal.

02 · Inside the renovation

Before the finishes.
Behind the walls.

The new lower level and interior spaces took shape through framing, stairs, services, and detailed installation work. These views document unfinished construction and later fit-out; they should not be confused with the untouched original 1881 interior.

More from the project archive

A closer look.

03 · The property’s transformation

The longer view.

The original approach, earlier interiors, and exterior progress photographs complete the story of how the property changed.

Historic character.
Contemporary comfort.

The restored home brings together its historic exterior and contemporary interiors, with carefully integrated lighting, sound, and modern systems. SAV Digital Environments’ project account describes the engineering and coordination required to introduce new technology within the old brick structure.

Today, Rouse House is the heart of Vintage Estate: a place to cook, gather around the table, and settle into downtown Bozeman. Its chef’s kitchen and dining spaces support time together, while the estate’s separate residences offer privacy.

Restored contemporary interior of Rouse House
A new chapter inside Rouse House.
Awards & press

A restoration
worth recognizing.

Completed outdoor terrace at Vintage Estate
The estate today: outdoor spaces made for time together.

2025 · City of Bozeman

Preservation Innovation · Large Project
Rouse House was recognized in the City’s annual Historic Preservation Awards.

Read the City’s award announcement ↗

2025 · CE Pro Home of the Year Awards

Gold · Best Before/After Retrofit Project
Silver · Best Combo Design + Tech Project

Awarded to SAV Digital Environments for its work on Rouse House, recognizing the integration of contemporary technology and design within the historic home.

Explore SAV’s award-winning project ↗

View CE Pro’s official 2025 winners ↗

March 17, 2026 · CE Pro

“Bozeman’s Historic Gothic Masterpiece Sees Stunning Revival in Smart Home Retrofit”

Nick Boever’s feature explores the restoration’s structural challenges and the careful integration of modern systems into the 1881 home.

Read the CE Pro feature ↗

Project spotlight · SAV Digital Environments

SAV’s account documents the project’s engineering challenges, concealed technology, and collaboration behind the renewal of Rouse House.

Read the project story ↗

04 · A home again

Ready for its next chapter.

Behind the project

The restoration timeline begins in 2018, based on the owners’ recollection and dated project photographs. Early images come from the owners’ construction archive and January 2023 project presentation. Additional interior construction views are published in SAV Digital Environments’ Rouse House case study, with Kevin Chartier credited where identified. Exact dates and some individual photographer credits remain unconfirmed. Completed views are from the estate’s existing photography collection.

City preservation award ↗SAV’s project account and awards ↗
Your chapter begins here

Make yourself at home.

Explore the residences and find the right arrangement for your stay.

Choose your stay ↗